We are currently running Horzon View 7.12. We need to migrate our composer and connection servers to new Windows 2019 VMs. I've found instructions for migrating the composer server.
Would migrating the connection server be as simple as adding a second connection server (replicated) running Windows 2019 and then decommission the old Windows 2012 connection server? If so, are there any special steps to decommission the old server? I'm not having much luck finding documentation for the process.