I have 2 vCenter connected by linked mode. There's production site and DR site. Both version are 6.0U3. The vCenters are planned to upgrade to 6.5U2.
I read through the article saying the proper upgrade method is to upgrade the PSC on both sites first then only upgrade the vCenters. Which site PSC need to be upgraded first?